Cabling specialist VSMC, a joint VolkerWessels and Boskalis company has been awarded a contract by EPC contractor Van Oord Offshore Wind Projects bv to install and bury a 25km long export cable for the Eneco Luchterduinen Offshore Wind Farm.
North Sea
The Eneco Luchterduinen Offshore Wind Farm, to be built by Eneco and Mitsubishi Corporation, will be situated in the North Sea, 23 km off the coast, between Noordwijk and Zandvoort, the Netherlands. With 43 wind turbines in total, Luchterduinen will provide up to 150,000 Dutch homes with green energy.
CLV Ndurance
The project will be executed in September of this year using the in-house developed burial tool, the Trenchformer and the newly built cable-laying vessel, the Ndurance; designed for both shallow and deep water operations.